CIN(POSOCO): U40105DL2009GOI188682

Screen Reader Access

Skip to main Content

Sitemap
  • A-/A+
Login Intranet Mail
Logo Image
ISO 9001 2015 ISO 27001 2013 ISO 14001 2015 ISO 45001 2018 IMS-Policy-2022
  • Home
  • About Us
    • Our Vision and Mission
    • Salient Features
    • Installed Capacity
  • Scheduling
    • Web Based Energy Scheduling (WBES)
    • Schedule XML Files
    • PSA
      • List of beneficiaries not scheduled due to unavailability of PSM
      • PSA Portal
    • NE Schedule Loss
  • Open Access
    • NOAR website
    • Web Based STOA Software
    • Open Access Transactions
      • Bilateral Transactions
      • Rejected Transactions
    • STOA Reconciliation
    • STU/SLDC Charges
    • STOA Bank Details
    • Open Access Regulations
  • Market Operation
    • DSM
      • DSM Rate
      • DSM Settlement
      • DSM Outstanding Status
      • DSM Reconciliation
      • DSM Interest
      • DSM Regulation
    • Reactive
      • Reactive Settlement
      • Reactive Outstanding Status
      • Reactive Reconciliation
      • Reactive Interest
      • Reactive Regulation
    • Ancillary services
      • AGC
        • AGC Regulation
        • AGC Interest
        • AGC Reconciliation
        • AGC Settlement
      • FRAS
        • FRAS Settlement
        • FRAS Outstanding Status
        • FRAS Reconciliation
        • FRAS Interest
        • FRAS Regulation
      • RRAS
        • RRAS Settlement
        • RRAS Outstanding Status
        • RRAS Reconciliation
        • RRAS Interest
        • RRAS Regulation
    • Reports
      • CERC DSM Monthly Report
      • Congestion Charges Reports
      • Monthly Violation Report
        • 12% Violation Report
        • Zero Crossing Violation Report
      • Schedule Vs. Actual Plot
      • Day-wise availability, schedule and Actual generation
      • Frequency Profile
    • Metering
      • Meter Details
        • Summary of SEM installed in NER
        • Constituent-wise Location of SEMs
      • SEM Data
      • Metering Manual
      • Metering Error
      • Metering Regulation
      • PoC
        • PoC Loss
        • PoC Order
        • PoC Regulation
    • Fees & Charge
      • Fees & Charges Software
      • FnC Orders
      • Fees & Charges Reconciliation
      • User List
      • Monthly Bill Statement
    • Bank Details
  • System Study
    • Transfer Capability
      • Transfer Capability Position
      • Monthly ATC
        • Inter Country
        • Inter Regional
        • Intra Regional
          • Other Regions
      • Intra Regional ATC
        • NER
          • Arunachal Pradesh
          • Assam
          • Manipur
          • Meghalaya
          • Mizoram
          • Nagaland
          • Tripura
  • Reports
    • Operational Feedback
    • Web Based Reporting Software
    • Annual Compendium
    • CERC KPI Reports
      • Voltage Deviation Index
        • Daily
        • Weekly
        • Monthly
      • Frequency Deviation Index
        • Daily
        • Weekly
        • Monthly
      • System Reliability
        • Daily
        • Weekly
        • Monthly
      • SEM Error
      • Shutdown Details
    • Daily Report
      • Power Supply Position (PSP) Report
    • Monthly Reports
      • MIS
        • Performance Report
        • Power Supply Position Report
        • Unit-wise Generation Report
        • System Status Report
      • Others
        • Grid Disturbance Report
        • PMU Based Analysis
        • Root Cause & Remedial Measures of Grid Events
        • Weather Related Reports
        • Load Forecast Error
    • Quarterly Reports
      • System Operation Reports
    • System Logistics Report
      • Central Sector and State Telemetry availability CERC report
      • States SCADA vs SEM mismatch report
    • Freqency Response Charactresitics (FRC) Report
    • Weekly Reports
      • Grid Event Reports
      • Weekly Report
  • Documents
    • Power Map
    • Operating Procedure of NER
    • List of Important Grid Elements of NER
    • Reactive Power Manual of NER
    • Black Start and Restoration Procedures of NER
    • Regulatory Tracker Reports
    • First Time Charging Procedure
  • Useful Links
    • POSOCO Websites
      • ERLDC
      • NERLDC
      • NLDC
      • NRLDC
      • SRLDC
      • WRLDC
    • Other Important Links
      • FOLD
      • PSDF
      • VIDYUT PRAVAH
      • MoP
      • CERC
      • MNRE
    • Govt/PSU
    • Electricity Regulatory Commissions
    • SEBs/Discoms
    • Renewable
      • REC Mechanism
      • RE Forecasting
  • Tender Section
    • Published Tenders
    • Tenders Awarded on Nomination Basis
  • More
    • HR
      • HR Magazine
      • Rajbhasha
        • हिंदी पखवाड़ा
        • राजभाषा कार्यान्वयन समिति की बैठक
        • कार्यशाला
        • तिमाही प्रगति रिपोर्ट
        • सम्मेलन
        • निरीक्षण
      • Initiatives
        • Swaccha Bharat Abhiyaan
        • CSR
        • Others
      • Our Employees
      • Empanelled Hospitals
        • List of Hospitals
      • Summer Internship Program
        • Report
      • Organization Chart
    • NERLDC Regulatory Affairs Cell
    • Transit Camp
    • Shutdown and Outage
      • Web Based Shutdown and Outage Software
      • Shutdown and Outage Procedure
      • Shutdown and Outage Flow Chart
    • New Element Integration
      • Transmission Elements
      • Generators
      • 400 kV and above elements
    • Transmission Pricing
      • PoC Losses
      • Latest PoC Order
    • Schedule Files prior to implementation of WBES (i.e. prior to 01-09-2018)
      • Finally Implemented Schedule files
      • Revision wise Schedule files
    • Renewables
    • Availability Verification
      • KMPL
      • NETC
      • POWERGRID
      • STERLITE
    • Disaster Management
      • Emergency Numbers
      • List of Nodal Officers
      • Control Centres
    • C&M
      • Various AMC in NERLDC
      • Vendor Registration
      • Useful Forms and Formats
    • Careers
      • Openings (Recruitment)
      • Candidate Downloads
      • Notifications
    • Industry-Academia Partnership
    • Petitions
    • Contact Us

Shutdown Details FY 19-20

Shutdown Details(FY 19-20)

Sr. Month Download/View
1. April Download 01 | Download 02
2. May Download 01 | Download 02
3. June Download 01 | Download 02
4. July Download 01 | Download 02
5. August Download 01 | Download 02
6. September Download 01 | Download 02
7. October Download
8. November Download
9. December Download
10. January Download
11. February Download
12. March Download
13. Summary Download

Disclaimer

Disclaimer


Precautions have been taken by North Eastern Regional Load Despatch Centre (NERLDC), POSOCO to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, North Eastern Regional Load Despatch Centre (NERLDC), POSOCO shall not be responsible for any errors or omissions. All information is provided without warranty of any kind. North Eastern Regional Load Despatch Centre (NERLDC) disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. North Eastern Regional Load Despatch Centre (NERLDC), POSOCO have no liability in tort, contract, or otherwise to user and/or third party. Further, North Eastern Regional Load Despatch Centre (NERLDC), POSOCO shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if North Eastern Regional Load Despatch Centre (NERLDC), POSOCO has been advised of the possibility of such damages. By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.

Azadi ka Amrit Mahotsav

Visitor Count

5696

Feedback & Grievances

Disclaimer

Walkthrough

About Us

Organization Chart

Contact Us

RTI Information

Useful Links

NCW Women's Helpline - 7827170170

Sitemap

Disclaimer

You are being redirected to other website.

Click "Yes" to proceed.

Yes

North Eastern Regional Load Despatch Centre(NERLDC), Power System Operation Corporation Limited(POSOCO)

POWERGRID Complex, Dongteih, Lower Nongrah, Lapalang,

Shillong - 793006, Meghalaya, India

nerldccr[at]posoco[dot]in

Copyright © 2021 POSOCO