Power System Operation Corporation Limited
      (A Government of India Enterprise)

 NORTH EASTERN REGIONAL LOAD DESPATCH CENTRE
             

           

IMS Policy 2019
Skip Navigation Links
FeedBack
Archive
About Us Expand     About Us
WEATHER
Document Updation
DownloadsExpand Downloads
Other RLDCsExpand Other RLDCs
R T I
Disaster ManagementExpand Disaster Management
Contact Us
SEARCH
Skip Navigation Links
Home
SchedulingExpand Scheduling
Transfer CapabilityExpand Transfer Capability
Open AccessExpand Open Access
Market OperationExpand Market Operation
Contracts & MaterialsExpand Contracts & Materials
ReportsExpand Reports
CERC-KPI ReportsExpand CERC-KPI Reports
REC Mechanism
New Element IntegrationExpand New Element Integration
Useful Links
Vigilance Complaints
Disclaimer
INTRANET
STOA Software
Reporting App
हिन्दी वेबसाइट
   
Demand Met
2208.60   
NER Grid Frequency
50.03
Current Sch Rev No
46
 

  News Flash
1 NERLDC website is available at http://www.nerldc.in/ and http://www.nerldc.org/
2 New STOA Software made live in NERLDC w.e.f 1st April 2019
3 ISGS under RSD - BgTPP Unit 1 (250 MW) w.e.f 18.30 Hrs of 04.05.2019 & RSD withdrawn at 23:02 hrs of 05.05.2019
4 Web based Energy Scheduling(WBES) system has been implemented from 1st September'2018 in NER

Link 
NERLDC: Registered Users
Temporary Suspension of Regulation of Power Supply to MePDCL from NEEPCO w.e.f. 02-06-2019
Final Scheme of Regulation of Power Supply to MeECL by NTPC w.e.f. 22-05-2019
Draft NOAR Procedure for Stakeholder Consultations
Procedure for Availing Start-up power for New Generating stations
Procedure for Integration of New Transmission Element into the Grid
NLDC Petition regarding inadequate FGMO response
Operating charges of Rs1000 per day or part as per provisions of amendment to CERC
IA on Petition 84/MP/2015_Implementation of FGMO in Indian Grid
Black Start and Restoration Procedures of NER Grid 2018
Detailed Procedure for Relieving Congestion in Real Time Operation 2013
NER REACTIVE POWER MANAGEMENT MANUAL 2018
ANNEXURE OF NER REACTIVE POWER MANAGEMENT MANUAL 2018
NERLDC PLI Petition For FY 2017-18
Contract Workers Details As Per Letter No 28/19/2017 Coord from US to GOI dated 17/03/2017
PoC rates and transmission losses for the period April to June 2018
New format for Affidavit for No Objection or Prior Standing Clearance for Bilateral and for Collective transactions
GYANODAY:Internship Gudilenes OF POSOCO
CERC approved procedure for drawal of start-up power




 
At 1150 Hrs on 20.04.19 a grid disturbance of GD-V Category occurred in which States of Mizoram Manipur South Assam part of Meghalaya Tripura including Bangladesh got separated from the rest of NER Grid and subsequently collapsed due to load generation mismatch. The system was progressively restored at 1530 hrs of 20.04.19.

 

एन.. आर. एल. डि. सि. उत्तर पूर्वी क्षेत्रीय विद्युत प्रणाली का सन्युक्त चालन सुनिश्चित करने हेतु शीर्ष संस्था है ।

NERLDC is the apex body to ensure integrated operation of the power system in the North Eastern Region.


  ©2000-2006 POSOCO